Selected Design
Microtunneling through
the 50 ft high hill for 3000 ft length, with the following reasons:
•Expected
to be lower initial cost than a pumped solution
•Projected
maintenance and reliability was higher with an
all gravity solution
•Electrical
power consumption costs would be high on pumped
solution
•Longer
life installation for least cost in the long run
•Minimal
disruption to the golf course